Research Article

Study of a Space-Time Monitoring of High-Speed Railway Underline Structure Using Distributed Optical Vibration Sensing Technology

Table 6

Left track line on-site measurement conditions.

LocomotiveDateTrack conditionTrain passing timeDirection

1st train2015.9.23Before repair18:04:20Left track (upward)
2015.9.24After repair18:04:09Left track (upward)

2nd train2015.9.23Before repair18:19:00Left track (upward)
2015.9.24After repair18:15:45Left track (upward)

3rd train2015.9.23Before repair19:03:51Left track (upward)
2015.9.24After repair18:05:45Left track (upward)

4th train2015.9.23Before repair19:15:30Left track (upward)
2015.9.24After repair19:14:36Left track (upward)