Research Article
Vibration-Isolation Performance of a Pile Barrier in an Area of Soft Soil in Shanghai
Table 1
Positions of measurement points in the first group of tests.
| ||||||||||||||||||||||||||||||
Note: the measurement points are used to collect the vibration accelerations as follows: ground traffic on Luoshan Road (GI-1); traffic on Luoshan Road viaduct (GI-2); maglev (GI-3); metro line 16 (viaduct part) (GI-4). |