Research Article

Vibration-Isolation Performance of a Pile Barrier in an Area of Soft Soil in Shanghai

Table 1

Positions of measurement points in the first group of tests.

GIGI-1GI-2GI-3GI-4

Distance between measuring point and hard-X-ray tunnel (m)92221305368
Buried depth (m)0000

Note: the measurement points are used to collect the vibration accelerations as follows: ground traffic on Luoshan Road (GI-1); traffic on Luoshan Road viaduct (GI-2); maglev (GI-3); metro line 16 (viaduct part) (GI-4).