Research Article

Vibration-Isolation Performance of a Pile Barrier in an Area of Soft Soil in Shanghai

Table 2

Positions of measurement points in the second group of measurements.

GIIGII-8GII-7GII-6GII-5GII-4GII-3GII-2GII-1

Distance between measuring point and hard-X-ray tunnel (m)3494160221221221221221
Buried depth (m)000047.834.619.14.5