Research Article

Development of a Model to Predict Vibrations Induced by Blasting Excavation of Deep Rock Masses under High In Situ Stress

Figure 4

Time-history curves of the vertical vibration monitored during the blasting excavation of diversion tunnel #4 for the Jinping II hydropower station (monitoring points #2 and #3). (a) Monitoring point #2. (b) Monitoring point #3.
(a)
(b)