Research Article
Calculation of the Vertical Strata Load of Utility Tunnel Crossing Ground Fissure Zone
Figure 9
Calculation model of interaction between the utility tunnel and Earth in the hanging wall of ground fissure. (a) Structural overall diagram. (b) Structural hanging wall force mode.
(a) |
(b) |