Research Article
An Optimal Algorithm for Planning Shearer Trailing Drum Cutting Path
Figure 4
Schematic diagram of different contact states between AFC and the floor plate: (a) two endpoints of the AFC bottom contact the floor plate; (b) the rear endpoint contacts the floor plate; (c) the front endpoint contacts the floor plate; (d) no endpoint contacts the floor plate.
| (a) |
| (b) |
| (c) |
| (d) |