Research Article
Study on Optimization of Delay Method of Wedge Cut Blasting in Tunnel
Figure 13
Monitoring points location. (a) Bottom monitoring points. (b) Top monitoring points. (c) Side monitoring points. (d) Back monitoring points.
(a) |
(b) |
(c) |
(d) |