Performance Degradation of Subsea Shield Tunnel Segment Accounting for Concrete Strength Loss and Steel Bar Corrosion
Table 1
The pretreatment methods for the three groups of concrete samples.
Groups of samples
Simulation object
Pretreatment method
Specific pretreatment processes
Group A
Uncorroded concrete
No treatment
None
Group B
Water saturated concrete
Soaking in warm pure water
Place the samples in an electric cooker filled with pure water, keep the water temperature at 60°C, and continue soaking for 24 hours to fully saturate the concrete samples
Group C
Chlorine-corroded saturated concrete
Soaking in warm chloride solution
Place the samples in an electric cooker filled with 2.5% NaCl solution, keep the water temperature at 60°C, and continue soaking for 24 hours to fully saturate the samples and ensure the chloride fully penetrates into the concrete, as demonstrated in Figure 2(b)