Research Article

Numerical Analysis of the Influence of Foundation Pit Blasting on a Nearby Metro Tunnel

Table 4

Maximum displacement and stress of linings for different conditions.

ConditionVelocity (cm/s)Vertical displacement (10−4 m)Horizontal displacement (10−4 m)Z-direction stress (MPa)X-direction stress (MPa)
TopBottomLeftRightTopBottomLeftRight

Static load0−50.03−27.5−9.2539.239−3.927−3.927−3.669−2.568
1st condition55.6755.9240.91.153−3.942−3.941−3.685−2.575
2nd condition1011.3511.8211.702.275−3.945−3.944−3.686−2.577
3rd condition1517.117.8552.603.429−3.950−3.949−3.692−2.579
4th condition2022.723.7193.3954.554−3.950−3.949−3.692−2.579