Influence of Discontinuities on Rock Failure under Blasting at Shuangjiangkou Hydropower Station

Table 1

Deformation of each pile position in main powerhouse and main transformer room.

Pile position (m)Upstream arch foot (mm)Downstream arch foot (mm)Average (mm)

The main powerhouseK0 + 000.650.400.53
K0 + 30.2 K0 + 60.40.620.410.52
0.560.490.53
K0 + 90.60.560.480.52

The main transformer roomK0 + 000.413.141.78
K0 + 30.20.492.561.53
K0 + 60.40.511.180.85
K0 + 90.60.480.630.56