Research Article
Influence of Discontinuities on Rock Failure under Blasting at Shuangjiangkou Hydropower Station
Table 1
Deformation of each pile position in main powerhouse and main transformer room.
| | Pile position (m) | Upstream arch foot (mm) | Downstream arch foot (mm) | Average (mm) |
| The main powerhouse | K0 + 00 | 0.65 | 0.40 | 0.53 | K0 + 30.2 K0 + 60.4 | 0.62 | 0.41 | 0.52 | 0.56 | 0.49 | 0.53 | K0 + 90.6 | 0.56 | 0.48 | 0.52 |