Depth of broken rock zone in main powerhouse and main transformer room.
| | Pile position (m) | Upstream arch foot (m) | Downstream arch foot (m) | Average (mm) |
| Main powerhouse | K0 − 30 | 0.6 | 0.4 | 0.5 | K0 + 010K0 + 040 | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 | K0 + 070 | 0.8 | 0.6 | 0.7 | K0 + 100 | 0.8 | 0.6 | 0.7 |
| Main transformer room | K0 − 30 | 1.8 | 1.6 | 1.7 | K0 + 010 | 3.4 | 3.0 | 3.2 | K0 + 040 | 2.4 | 2.4 | 2.4 | K0 + 070 | 2.4 | 2.8 | 2.6 | K0 + 100 | 2.4 | 2.8 | 2.6 |
|
|