Research Article

Influence of Discontinuities on Rock Failure under Blasting at Shuangjiangkou Hydropower Station

Table 2

Depth of broken rock zone in main powerhouse and main transformer room.

Pile position (m)Upstream arch foot (m)Downstream arch foot (m)Average (mm)

Main powerhouseK0 − 300.60.40.5
K0 + 010K0 + 0400.60.60.6
0.60.60.6
K0 + 0700.80.60.7
K0 + 1000.80.60.7

Main transformer roomK0 − 301.81.61.7
K0 + 0103.43.03.2
K0 + 0402.42.42.4
K0 + 0702.42.82.6
K0 + 1002.42.82.6