Effects of Excavation Gap Filling of Under-1 Crossing Tunnel on Pipelines
Table 5
Sewage pipe measuring point vertical displacement.
| Vertical displacement (mm) | Excavation gap (filling) | Excavation gap (is not filled) | Error | Percentage of error |
| A | −8.06 | −11.98 | 3.92 | 32.7 | B | −7.24 | −11.90 | 3.92 | 39.15 | C | −6.31 | −10.89 | 4.58 | 42 | D | −7.15 | −10.89 | 4.04 | 36.1 |
|
|