Research Article

Effects of Excavation Gap Filling of Under-1 Crossing Tunnel on Pipelines

Table 5

Sewage pipe measuring point vertical displacement.

Vertical displacement (mm)Excavation gap (filling)Excavation gap (is not filled)ErrorPercentage of error

A−8.06−11.983.9232.7
B−7.24−11.903.9239.15
C−6.31−10.894.5842
D−7.15−10.894.0436.1