Research Article
Optimization of the Hollow Rectification Sill in the Forebay of the Pump Station Based on the PSO-GP Collaborative Algorithm
Figure 9
Surface flow field diagram of each plan: (a) plan 1, (b) plan 2, (c) plan 3, (d) plan 4, (e) plan 5, (f) plan 6, (g) plan 7, and (h) plan 8.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
| (g) |
| (h) |