Cracking prediction of the Shaohuoping tunnel with the SEDR principle: (a) the initial crack outside the arch springing at 3.52 s; (b) the crack inside the invert at 6 s; (c) the crack expansion inside the invert at 10 s; (d) the crack expansion outside the arch springing at 14 s; (e) the crack expansion inside the invert at 17 s; (f) the annular expansion at 22 s; (g) the crack expansion outside the arch springing at 25 s; (h) the fault and crack at the construction joint.