Research Article

Time-Frequency Analysis and Application of a Vibration Signal of Tunnel Excavation Blasting Based on CEEMD-MPE-HT

Table 1

Basic design parameters of expanded excavation of the Loushan tunnel (unit: m).

ProjectLoushan tunnel after expansionLoushan tunnel before expansion

Section formTwo-way eight-laneTwo-way four-lane
Width of carriageway (m)2 × 3.50 + 2 × 3.752 × 3.75
Lateral dimension (m)0.500.50
Width of maintaining roadway (m)0.750.75
Total width (m)17.2510.25
Tunnel clearance (m)5.005.00