Time-Frequency Analysis and Application of a Vibration Signal of Tunnel Excavation Blasting Based on CEEMD-MPE-HT
Table 1
Basic design parameters of expanded excavation of the Loushan tunnel (unit: m).
| Project | Loushan tunnel after expansion | Loushan tunnel before expansion |
| Section form | Two-way eight-lane | Two-way four-lane | Width of carriageway (m) | 2 × 3.50 + 2 × 3.75 | 2 × 3.75 | Lateral dimension (m) | 0.50 | 0.50 | Width of maintaining roadway (m) | 0.75 | 0.75 | Total width (m) | 17.25 | 10.25 | Tunnel clearance (m) | 5.00 | 5.00 |
|
|