Research Article

Mechanism and Procedure of Repeated Borehole Drilling Using Wall Protection and a Soft Structure to Prevent Rockburst: A Case Study

Figure 20

Plastic zone. (a) Roadway without a soft structure. (b) Roadway with a soft structure.
(a)
(b)