Research Article
Research on In Situ Stress Distribution of the Railway Tunnels in Southwest China Based on the Complete Temperature Compensation Technology
Figure 6
Stress relief curve of each measuring point. (a) Measuring point 1. (b) Measuring point 2. (c) Measuring point 3. (d) Measuring point 4. (e) Measuring point 5.
(a) |
(b) |
(c) |
(d) |
(e) |