Abstract
When an earthquake occurs, due to the high operation speed of the train group, there is still a long distance from braking to stopping, so it needs a large number of bridge spans to calculate the integrated dynamic response, which leads to a large amount of calculation of the train-track-bridge (TTB) system under a seismic event. In order to reduce the amount of calculation, this paper proposed an efficient model called closed-loop model for simply supported railway bridge. The proposed model is realized by coupling the head and end of the rail-slab-bridge system through the utilization of pseudo-element. Simulation comparison of TTB response with and without seismic excitation between conventional TTB model and efficient model indicates that, under the premise of ensuring calculation accuracy, the efficient model shows the advantage of fewer degrees of freedom (DOF) of model and higher computational efficiency. For instance, under El Centro earthquake excitation, the time cost of proposed model is only 6% of conventional model. Meanwhile, six seismic events with different acceleration amplitudes are imposed on the efficient model, and the results of car-body acceleration, wheel-rail force, and wheel load reduction ratio are gathered and discussed; it can be concluded that, except Trinidad earthquake, for other earthquake samples investigated in this paper, with acceleration amplitude larger than 0.8 g, the train operation is at the risk of derailment.
1. Introduction
With the popularity of high-speed railway (HSR) worldwide and the rapid development of HSR technology in recent decades, operation safety of HSR under extreme circumstances becomes an issue worthy of attention and research. As high-speed railway simply supported bridge (HSRSSB) has better geometry and stiffness irregularity, it is often used as the infrastructure of HSR line, as shown in Figure 1. In addition, the fact that China is located between the world’s two major seismic belts, the Pacific Rim seismic belt and the Eurasian seismic belt, poses certain challenges to the earthquake resistance of high-speed railway bridges and the safety of train operation during earthquakes.

There are high-speed train derailments caused by earthquakes around the world, on October 23, 2004, a 6.8 magnitude earthquake struck Niigata Prefecture, Japan, the Shinkansen train Ibis 325 was operating at 200 km/h, and the earthquake directly led to the derailment of train group. Fortunately, there were no casualties [1]. On March 4, 2010, a high-speed train was going through Tainan New City when a 6.7 magnitude earthquake hit Kaohsiung, which caused two wheels to derail. Due to the vast and scattered nature of the earthquake area, as well as variable earthquake frequencies, it is inevitable that HRS may be hit by earthquakes during operation, which shows tremendous significance to research the railway traffic safety under the earthquake. Scholars and engineers have also been conducting research and simulation of high-speed trains operation under seismic events.
Currently, train-track-bridge (TTB) model analysis is maturing [2–4]. These studies based on finite element (FE) modeling have formed a relatively complete theoretical system of the response of TTB system. Xu et al. [5, 6] developed a TTB model based on coupling strategies and matrix representations with track irregularity as excitation. Zakeri et al. [7] investigated the sensitivity of different structural parameters and the dynamic response of structural under different moving-load speed.
The establishment and investigation of these TTB models make the original rough model more accurate and reliable and lead to more realistic simulation results. With the development of the TTB theory and model, scholars also began to investigate the operation safety problem under seismic excitation. Yang and Wu [8] investigated the dynamic stability and derailment of train group under earthquake. Nishimura et al. [9] revealed the relationship of vehicle speed and wheel slide under seismic through comparison between full-scale experiment and model simulation. The research results of Montenegro et al. [10] show that, in the design of high-speed railway simply supported beam bridges, although moderate earthquakes are not the main threat to structural integrity, it is necessary to take them into consideration in the design process due to the risk of rim climbing and derailment. Yu et al. [11] analyzed in depth the bridge response under near-fault earthquake. These researches provide valuable theoretical basis and reference for the seismic design of HSRSSB. Chen and Zhai [12], Liu et al. [13], and Lai et al. [14] analyzed the running safety and comfort of train passing the bridge considering the girder deformation of bridge. The research of Jin et al. [15] indicates that the ignoration of vertical ground motion components may lead to overestimation of the threshold intensity and will severely affect the safety evaluation of HSRSSB under seismic events. Liu et al. [16] calculated the dynamic response limit of track-bridge system considered running safety under earthquake.
However, some conventional TTB models encounter issues such as modeling complexity and low computational efficiency. In some modeling cases, the length of rail, slab, and girder can be kilometers, in accordance with FE theory, the degrees of freedom (DOF) could be significantly large, which leads to huge computational burden, to further optimize the model, Zhai [17] proposed a family of explicit two-step algorithms which are convenient and economical for large-scale dynamic problems, and Zhu et al. [18] proposed a new hybrid solution algorithm combined with strongly coupled method and loosely coupled method and utilized multi-time-step method to enhance the computational efficiency of TTB coupled model. Tanabe et al. [19] proposed an innovative computational method which has the ability to avoid the round-off error during the calculation of the radical dynamic wheel-rail interaction under seismic excitation. These researches above focused on the continuous creation and innovation of algorithms to improve the accuracy, stability, and computational efficiency of TTB system.
In addition to the enhancement of computational efficiency, increasing modeling efficiency and stability is another way for TTB interaction improvement. Yang and Hwang [20] combined the direct stiffness method and mode superposition method to improve the convergence. Zeng et al. [21] divided rail, slab, girder, and piers into different beam elements and coupled them in accordance with energy principle. Zhang et al. [22] discussed the influence of bridge span number and pier heights on the seismic response sensitivity of HSRSSB. The research is based on an innovative equivalent model, which is obtained by attaching springs with equivalent stiffness of adjacent structures to both sides of the target spans [23].
On top of the contributions mentioned above, some researches improved the accuracy and computational efficiency of the TTB model through innovation of wheel-rail interaction [24–26]. Gu et al. [27] proposed a wheel-rail element to simulate the nonlinear vertical wheel-rail relationship. This element regards the wheel-rail displacement as the form of “additional displacement” to simplify the complex wheel-rail coupling relationship. Liu et al. [28] proposed a novel 3D wheel-rail interaction element (WRI) on the platform OPENSEES. This WRI element is capable of being conducted under many nonlinear scenarios such as nonlinear elements, materials, and algorithms. Moreover, the significant applicability also allows the WRI element to be utilized in various finite element models. Xu et al. [29, 30] analyzed the vehicle-track coupled dynamic system based on multi-finite-element coupling method and multi-time-step solution method.
This paper aims to enhance the TTB interaction efficiency from the perspective of the modeling efficiency and proposes an optimized TTB model. The comparison between this new TTB model and conventional model will validate the accuracy of the new model; meanwhile, the efficiency comparison will be discussed as well. Model performance under seismic excitation will be investigated through the case analysis of seven earthquakes samples, and relevant results will be illustrated.
2. Efficient Model of TTB System
2.1. Basic Model Theory
In this paper, the whole TTB system is consisted with high-speed train model and simply supported beam bridge system. The model of high-speed train is considered as a mass-spring-damping system; the car-body, bogie, and wheel set are considered as rigid body. According to the principle of energy variation, the dynamic equation of train can be written aswhere , , and denote mass, damping, and stiffness matrix of train, respectively; denotes the force vector of train, and it includes wheel-rail contact force, the gravity of the train itself, and earthquake force.
Finite element method is utilized to establish the model of simply supported beam bridge. The simply supported beam bridges are regarded as Bernoulli-Euler beam elements, and the structural damping of track-bridge (TB) system is assumed as Rayleigh damping [31]. The dynamic equation of the TB system is expressed aswhere , , and denote mass, damping, and stiffness matrix of TB system, respectively; denotes the force vector of the TB system, which includes force of wheel-rail contact and earthquake force.
The train and TB are coupled as a whole system by wheel-rail contact. Only vertical wheel-rail interaction is investigated in this paper. The wheel-rail force is determined by the amount of vertical compression and calculated in accordance with Hertz nonlinear elastic contact theory.where , are the vertical displacement of wheel set and rail at the point, and is the track irregularity at point. is the contact deflection coefficient, for the abrasion type tread:where R is the wheel rolling radius. Linearize the nonlinear stiffness through equation below:where parameter denotes the static load of wheel set.
In consistence with the elastic potential energy conservation principle, the dynamic equation of the coupled train-track-bridge system can be expressed as
2.2. Closed-Loop TTB System Model
Usually, a ground motion lasts for a long time, and the train runs at a fast speed; thus, in conventional TTB seismic simulation, a simply supported bridge model needs a lot of spans to provide enough operation length for analysis of an integrated process of ground motion. For example, under the scenario of 300 km/h operation speed and the 15-second ground motion, the train will run 1250 m. If a 32 m standard simply supported bridge is adopted, it would need at least over 40 spans. Such a numerous number of spans will occupy a large amount of computer memory and CPU, and the analysis of the whole process of train safety on bridge under earthquake will bring a large amount of calculation. The purpose of this paper is to propose an efficient model to enhance the efficiency of TTB system simulation for simple supported bridge under the premise of accuracy and reliability.
After a train group passes a certain bridge for a certain distance, the dynamic response of the bridge due to train-pass will gradually reduce till it disappears; therefore, the TTB system can form a closed-loop as shown in Figure 2. When the dynamic response of the bridge span that has passed disappears, the train group will reenter the bridge span through the closed-loop model.

The key principle of the closed-loop TTB model is to decrease the size of TB matrices and improve simulation efficiency as much as possible; in order to achieve this, programming language is utilized to create a pseudoelement at the end of the bridge model, as illustrated in Figure 2. The pseudoelement couples the head and end of bridge together so the high-speed train group can operate back to the head of the bridge (Node A) after finishing one loop of total bridge length. In this way, the simplification of model simulation is obvious and significant. For instance, one 40-span bridge can be replaced by 4 cycles of 10-span bridges, which indicates the size of TB matrices can be decreased 75%. However, it is known that the dynamic response of the TB system is a process of gradual convergence. If the span number set in the proposed model is too small, the high-speed train group passes the same span unit before the dynamic response total convergence, which leads to superposition of vibrations; the acceleration, velocity, and displacement of the bridge span will be different from reality; the calculation accuracy of the model will be affected as well. But if the number of bridge span is too large, the meaning of simplification is lost.
2.3. Program Implementation
The closed-loop TB model can be easily established by coupling the head and end of the TB system matrix. Take the rail stiffness matrix Kr and the mass matrix Mr of the vertical model for example; it is assumed that the rails of each span have Ne0 elements, and the rails between adjacent spans are connected by one element. The number of total rail units is Ne. The left node of the last element (the Neth element) is the last node of the rail model, and the right node of the Neth element is the first node of the rail model belonging to the first span, as shown in Figure 3. By adopting the matrix “check-in rule,” the rail elements can be assembled into a closed-loop rail FE matrix as shown in Figure 4. When the track slab is a longitudinally connected slab, the stiffness matrix and mass matrix adopt the same method; for unit plate track slab, the stiffness matrix and mass matrix are consistent with the bridge model. The damping of the TB system is obtained by Rayleigh damping.


In the closed-loop TTB model, train group will circularly operate on the bridge. Take a two-span closed-loop bridge model and a single-section vehicle model as an example. As shown in Figure 5, the first wheel set of the train in Figure 5(a) enters the last element. As the train continues to move forward, the wheel set returns to the first element as illustrated in Figure 5(b). The track irregularity excitation in the closed-loop TTB system is set as a time domain sample.

(a)

(b)
3. Efficient Model Validation
In the efficient model, ICE-3 train group consisting of 2 bullet trains and 6 trailers is simulated with constant speed, 300 km/h (83.33 m/s). The parameters of bullet trains and trailers are listed in Table 1.
Based on the prototype of standard 32 m simply support beam bridge with CRTS II track slab [32] as mentioned in Section 2, the TB system is modeled as a multiple-layer Bernoulli-Euler beam as illustrated in Figure 6. The element length for FE analysis is the spacing of fasteners, 0.64 m, and the bridge approach is set as 200 m to ensure the carriages and wheel sets stable operation, while rigid subgrade is assumed to make the model more accurate and realistic.

Integral step size of the Newmark- integration method is set as 10−4 seconds, and the total operation time of the high-speed train is 15 seconds. The parameters of TB system are listed in Table 2.
Closed-loop models with five-span, seven-span, nine-span, and eleven-span are simulated, and the modeling results including vertical displacement at midspan of 1st span are gathered and compared with 30-span simply supported beam bridge model (comparison group). The properties of trains and TB system of all models mentioned above are the same, which are listed in Tables 1 and 2, the head of the 30-span bridge is directly connected with bridge approach, and the end of bridge is connected with rigid subgrade, which is different from closed-loop models.
Figure 7(a) demonstrates the comparison of bridge displacement at midspan of 1st span between 30-span model and closed-loop model with 5-span; it shows that the time-history-displacements of the two models show significant difference from the sixth peak, and the maximum value of five-span closed-loop model is 1.58 mm, while the value of thirty-span model is only 0.91 mm; the potential reason for the difference is the vibration superposition.

(a)

(b)

(c)

(d)
As for comparison of other closed-loop models, the time-history-displacements are basically consistent with the thirty-span model as illustrated; however, in Figure 7(b), the time-history-displacement of the convergence part is covered by the reentry of the train group; to show the complete vibration process of the bridge, closed-loop models with more cycle spans are necessary. In Figures 7(c) and 7(d), closed-loop models with nine-span and eleven-span can both record the integrated convergence of bridge vibration, but the DOF of eleven-span model is larger than nine-span model; meanwhile, the computational time costs of eleven-span and nine-span model are 390 seconds and 316 seconds. It can be concluded that, under the operation speed at 300 km/h (83.33 m/s), the nine-span efficient model can guarantee the precision of calculation and achieve the most efficient model analysis.
Besides the operation speed and the span-length of the bridge, other parameters such as the length of the car-body as well as the number of train-groups also affect the span number of the closed-loop model. This paper only analyzes and discusses the above-mentioned working conditions.
In order to validate the nine-span efficient model and measure the accuracy of it, further investigation is conducted. In Table 3, the natural frequency of vibration comparison reveals that the first five modes’ frequencies of the two models are similar, which leads to similar responses of the two bridge models under external excitation.
Different from the thirty-span model, the high-speed train of closed-loop model with nine-span returns back to the 1st span instead of leaving the bridge; thus, the 1st span of the closed-loop model can be equivalent to the 1st, 10th, 19th, and ()th spans of the thirty-span model; as a consequence, in this paper, the time-history behaviours of the 1st span, the 10th span, and the 19th span of the thirty-span model are gathered and compared with the results of the 1st span in efficient model, to evaluate the accuracy of the efficient model. The comparison time-history responses of bridge displacements at mid span are shown in Figure 8.

(a)

(b)

(c)
As shown above, the bridge time-history-displacements of these two models both have 7 peaks and 6 troughs and gradually converge to 0 when the high-speed train group passed. The maximum value listed in Table 4 of bridge displacements also indicates that the simulation results of two models are basically consistent and the errors are significantly small. In the time-history-displacement curves shown in Figure 8, differences appeared before the first peak appears; it is because, in the 30-span model, the bridge element does not vibrate before the train goes through, while the bridge element does not have complete convergence before the train goes through again in the closed-loop model.
Time-history wheel-rail force and displacement of vehicle reflect the dynamic response of the vehicle body in the coupling system; the displacement of 1st vehicle and the wheel-rail force of 1st wheel set are collected to validate the vehicle response of closed-loop model, which are shown below. Figure 9(a) captures the 1st vehicle displacement when train group operation is stable. In these two models, the displacements of 1st vehicle oscillate between 1.89 mm and −4.32 mm, while in Figure 9(b), the wheel-rail forces of 1st wheel set oscillate between 121.6 kN and 196.1 kN, with the oscillation axis of static axle load, 156.8 kN. The consistency of these two models in the time-history response of vehicle displacements and wheel-rail forces verifies the accuracy of the efficient model.

(a)

(b)
4. Seismic Simulation of Efficient Model
4.1. Model Comparison under Seismic Excitation
In this case, the efficiency and accuracy of 9-span closed-loop model under seismic excitation will be compared with the results obtained by integrated simply supported bridge model. Figure 10 shows the excitation imposed on the TTB system, which is based on El Centro vertical earthquake (referring to PEER Ground Motion Database [33]), the whole earthquake period is 35 seconds, and the acceleration amplitudes of 0.1 g, 0.2 g, and 0.4 g are simulated. As illustrated, the earthquake begins when the last wheel set goes through the bridge approach and contacts TB system. To observe the integrated dynamic response of vehicle and TB system, the total simulation time is 45 seconds. For all results collected and discussed below, the data of the first second are deleted due to the instability of the high-speed train operation.

Under the scenario of 300 km/h (83.33 m/s) operation speed and 45-second operation time mentioned above, the integrated simply supported bridge model has to be set as a 115-span bridge (35270 DOF) to complete the seismic simulation, while the closed-loop model is only a nine-span bridge model with 2834 DOF, which is only 8% DOF of the 115-span model. Table 5 lists the simulation time cost of two kinds of model; the efficiency of efficient model is at least 14 times of 115-span model.
Figures 11–13 demonstrate the simulation results comparison between these 2 models under the earthquake acceleration amplitude of 0.4 g. The acceleration of 1st car-body oscillates between 1.82 m/s2 and −1.74 m/s2, while the error of maximum and minimum acceleration values of 2 models is less than 0.1%. The wheel-rail forces and wheel load reduction ratio results of 1st wheel set are consistent as well; wheel-rail force oscillates between 114 kN and 202 kN. The reason for the mutation value (250 kN) is the unstable operation of the wheel set when it contacts with the bridge. The wheel load reduction ratio oscillates between 0.277 and −0.289. Case 1 validates that the closed-loop model has better computational efficiency compared with conventional model on the premise of accuracy and reliability.



4.2. Response under Vertical Earthquake
Six vertical ground motions are chosen as excitation to observe the response of TTB system under nine-span closed-loop model as listed in Table 6. For all vertical earthquakes, the acceleration amplitudes of 0.1 g, 0.2 g, and 0.4 g are simulated; the results of 1st car-body acceleration, wheel-rail force, and wheel load reduction ratio of 1st wheel set are also recorded and illustrated.
Figure 14 demonstrates the system response of 9-span closed-loop model under Kobe vertical earthquake (Figure 15). The time-history acceleration of 1st car-body is similar to the seismic acceleration, and with the acceleration amplitude increase, the peaks and troughs of time-history-acceleration of car-body scaled accordingly as well. The maximum acceleration of 1st car-body (0.1 g, 0.2 g, and 0.4 g) is 1.28 m/s2, 2.50 m/s2, and 4.95 m/s2, respectively. It is obvious that, with the increase of earthquake acceleration amplitude, the increase of car-body acceleration is linear.

(a)

(b)

(c)

The time-history records of wheel-rail force and wheel load reduction ratio are shown in Figures 14(b) and 14(c), respectively. Wheel-rail force of 1st wheel set under earthquake acceleration amplitude of 0.1 g oscillates between 113 kN and 198 kN. When earthquake acceleration amplitude increases to 0.2 g, wheel-rail force oscillates between 112 kN and 200 kN, and for 0.4 g, wheel-rail force oscillates between 98 kN and 213 kN; it is obvious that, with the increase of earthquake acceleration amplitude, the oscillation amplitude of wheel-rail force increases simultaneously, the oscillation amplitude of wheel load reduction ratio increased as well, and the maximum value of wheel load reduction ratio linearly increased from 0.32 to 0.48.
4.3. Earthquake Comparison and Analysis
In order to investigate the variation trend of car-body acceleration, wheel-rail force, and wheel load reduction ratio under different acceleration amplitudes, for all earthquake samples mentioned above, seismic excitations with acceleration amplitudes from 0.1 g to 1.0 g (0.1 g increase interval) are imposed on the nine-span closed-loop model. The maximum values of parameters mentioned above are collected and illustrated. As shown in Figure 16(a), the increases of maximum acceleration of car-body under these 6 earthquake events are linear. Under the 1.0 g acceleration amplitudes, the Northridge vertical earthquake leads to maximum car-body acceleration, which is 14.0 m/s2, and the Trinidad earthquake leads to minimum value, 11.5 m/s2.

(a)

(b)

(c)
For wheel-rail force, except Imperial Velley vertical earthquake, maximum values of wheel-rail force under other earthquake events linearly increase. 0.7 g is the slope inflection point of Imperial Velley earthquake, and under the 1.0 g acceleration amplitudes, the wheel-rail force under Imperial Velley earthquake is at least 3.9 times that of others. Figure 16(c) shows similar situation with wheel-rail force, when acceleration amplitude is larger than 0.6 g, the wheel load reduction ratios of Imperial Velley earthquake reach 1.0, while under other earthquake events, wheel load reduction ratios linearly increase to maximum value of 0.94. Overall, the dispersion of these three parameters is relatively small under low acceleration amplitude but becomes more and more discrete as the seismic acceleration amplitude increases.
According to relevant Chinese standard [34], the wheel load reduction ratio of train operation should not exceed 0.6 for operation safety considerations. Combined with Figure 16(c), under Kobe, Imperial Valley, Loma Prieta, and Tabas Iran earthquake events, acceleration amplitudes exceeding 0.6 g may lead to derailment due to overweight reduction on one side wheel. The threshold for Northridge is 0.8 g, and for Trinidad earthquake, when acceleration amplitude is larger than 1.0 g, the train operation may be at risk of derailment.
5. Conclusion
This paper proposes an efficient model called closed-loop model for TTB system simulation under seismic excitation. The TB system is modeled as three-layer Bernoulli-Euler beam in accordance with finite element theory, and the simplification of the model is obtained by coupling the head and end of TB system with pseudo-element. ICE-3 high-speed train group containing 2 bullet trains and 6 trailers with linear suspension are modeled as a mass-spring-damping system. A comparison between nine-span closed-loop model and thirty-span without simplification is set to validate the accuracy of the model and the consistency of maximum displacement of bridge at midspan, acceleration of car-body, and wheel-rail force verifies the reliability of this new efficient model. Simulation under El Centro vertical earthquake proves that the closed-loop model has calculation accuracy under seismic excitation. Investigation and analysis under six earthquake events reveal that, under different acceleration amplitude of different earthquakes, the variation of car-body acceleration, wheel-rail force, and wheel load reduction ratio are basically linear. All investigation could be concluded as below:(1)The closed-loop model is reliable and accurate, regardless of whether the seismic excitation is simulated. When compared with conventional model, the errors of maximum value bridge displacement at midspan are less than 0.2%; the time-history records of car-body acceleration and wheel-rail force are consistent as well. However, in this paper only one working condition is discussed; if the model parameters such as train operation speed change, the span number of closed-loop model should be adjusted as well.(2)The closed-loop model has high computational efficiency. For instance, under the scenario of 45 s operation time, the total DOF of efficient model is only 8% that of conventional model. Meanwhile, the computational time cost is one-fourteenth that of conventional model.(3)The acceleration amplitude directly affects the response of train group. Take the Kobe vertical earthquake for example; with the increase of earthquake acceleration amplitude, the oscillation amplitudes of time-history 1st car-body acceleration, wheel-rail force of 1st wheel set, and wheel load reduction ratio of 1st wheel set changed simultaneously.(4)As for different earthquake samples, with the increase of earthquake acceleration amplitude, the maximum values of train operating indicators mentioned above linearly increase simultaneously. When the earthquake acceleration amplitude exceeds 0.7 g, the maximum wheel-rail force under Imperial Velley earthquake increases with a significantly larger slope, and the wheel load reduction ratio reaches 1.0. According to relevant Chinese standard [34], except the Trinidad earthquake, with other earthquake events with larger than 0.8 g acceleration amplitude, the train operation is at the risk of derailment.(5)Though the closed-loop model proposed in this article is mainly focused on vertical TTB interaction response, it provides new modeling ideas for the TTB coupling system and puts forward relevant conclusions for vertical seismic as well; with reference to the closed-loop modeling theory of this article, the research on the model aimed at longitudinal and transverse direction seismic is also ongoing.
Data Availability
The data used to support the findings of this study are included within the article.
Conflicts of Interest
The authors declare that they have no conflicts of interest.
Acknowledgments
The work described in this paper was supported by grants from the National Natural Science Foundation of China (Grant nos. U1934207, 51778630, and 11972379) and Key R&D Program of Hunan Province (Grant no. 2020SK2060).