Research Article
Prediction of Bench Blasting Vibration on Slope and Safety Threshold of Blasting Vibration Velocity to Undercrossing Tunnel
Table 4
Monitoring data on the tunnel surrounding rock.
| Blasting times | Horizontal distance (m) | Vertical distance (m) | Maximum charge per delay (kg) | PPV (cm/s) | PVS (cm/s) | x | y | z |
| 1 | 304 | 38 | 310 | 0.7 | 0.7 | 0.6 | 0.9 | 2 | 365 | 28 | 315 | 0.5 | 0.3 | 0.4 | 0.6 | 3 | 94 | 28 | 315 | 3.5 | 0.9 | 1 | 3.8 | 4 | 88 | 17 | 243 | 5.8 | 4.5 | 5 | 6.2 | 5 | 85 | 16 | 174 | 6.9 | 9.5 | 8.5 | 13.3 | 6 | 109 | 15 | 168 | 4.6 | 7 | 8.4 | 9.4 | 7 | 109 | 29 | 168 | 1.4 | 1.8 | 1.9 | 2.5 | 8 | 111 | 29 | 168 | 4.7 | 3.8 | 2.7 | 5.9 | 9 | 58 | 15 | 165 | 4.4 | 7.1 | 7.1 | 7.3 | 10 | 98 | 15 | 252 | 7.9 | 8.9 | 9.3 | 12.1 |
|
|