Research Article
Method to Calculate Mining-Induced Fracture Based on the Movement and Deformation of Overburden Strata
Table 2
Calculation of HWFZ by different methods.
| | Mining scheme | Proposed method in paper (m) | Traditional methods (m) | Error rate (%) | | Equation (9) | Equation (10) | Equation (9) | Equation (10) |
| | Scheme 1 | 68.4 | 53.68 | 64.78 | 21.52 | 5.29 | | Scheme 2 | 99.2 | 53.68 | 64.78 | 45.89 | 34.70 | | Scheme 3 | 140.8 | 53.68 | 64.78 | 61.88 | 53.99 |
|
|