Research Article
A Novel Mining Method for Longwall Panel Face Passing through Parallel Abandoned Roadways
Table 1
Support capacity of No.15 shields changes.
| | Serial number of PAR | 1 | 2 | 3 |
| | Width of SP (Lm, distance of the PAR and the face) (m) | 15 | 11 | 5 | 0 | 15 | 10 | 6 | 0 | 16 | 8 | 3 | 0 | | Support capacity of shield (PT) (kN) | 5728 | 3853 | 5220 | 2702 | 5798 | 4935 | 6332 | 3354 | 5696 | 3876 | 5479 | 2941 |
|
|