Research Article

Open-Pit Mine Geological Model Construction and Composite Rock Blasting Optimization Research

Table 2

The model group with different hole network parameters.

Model numberHole depth (m)Blasting delay between holes (ms)Blasting delay between rows (ms)Hole distance (m)Row spacing (m)

1156012054
255
365