Research Article

Open-Pit Mine Geological Model Construction and Composite Rock Blasting Optimization Research

Table 3

Statistical table of peak effective stress at special points.

Model numberHole distance (m)Row spacing (m)Effective stress peak (MPa)

ABCDE
15418.4515.6519.8715.4417.16
25518.2319.8420.8820.4522.92
36516.2716.5514.2318.5910.34