Research Article
Numerical Simulation on Dynamic Response of Existing Tunnel to Moving-Axle Loads under the Influence of Oblique Shield Crossing the Intersection Area
Figure 12
Peak displacement of observation points on existing tunnel: (a) shield excavation reaches the 38th ring on the right; (b) shield excavation reaches the 52th ring on the right; (c) shield excavation reaches the 67th ring on the right.
(a) |
(b) |
(c) |