Research Article

Study on the Influence of Train Dynamic Load on underneath Tunnel Cast-in-Situ Concrete in Early Age

Table 3

Working conditions.

ConditionComputing parametersInvariant parameter

1Buried depth3 mTrain speed: 80 km/h, cross angle: 67.5°, rock level: V
24.5 m
36 m
48 m
510 m
612 m
715 m

8Train speed40 km/hBuried depth: 6 m, cross angle: 67.5°, rock level: V
960 km/h
1080 km/h

11Cross angleBuried depth: 6 m, train speed: 80 km/h, rock level: V
1222.5°
1345°
1467.5°
1590°

16Rock levelIIIBuried depth: 6 m, train speed: 80 km/h, cross angle: 67.5°
17IV
18V