Research Article

A Geomechanical Model Test on the Construction Stability and Overload Failure Process of an X-Type Cross Cavern Group

Figure 5

Model construction process: (a) mix material; (b) pour in the reaction force device; (c) compact materials; (d) air-dry with large fans; (e) install pressure cell; (f) install displacement measurement point.
(a)
(b)
(c)
(d)
(e)
(f)