Research Article
A Geomechanical Model Test on the Construction Stability and Overload Failure Process of an X-Type Cross Cavern Group
Figure 5
Model construction process: (a) mix material; (b) pour in the reaction force device; (c) compact materials; (d) air-dry with large fans; (e) install pressure cell; (f) install displacement measurement point.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |