Research Article
A Geomechanical Model Test on the Construction Stability and Overload Failure Process of an X-Type Cross Cavern Group
Figure 9
Pictures of the chamber group after excavation: (a) main roadway; (b) drift; (c) the intersection of the main roadway and drift; (d) the intersection of the drift and main roadway.
(a) |
(b) |
(c) |
(d) |