Research Article

A Geomechanical Model Test on the Construction Stability and Overload Failure Process of an X-Type Cross Cavern Group

Figure 9

Pictures of the chamber group after excavation: (a) main roadway; (b) drift; (c) the intersection of the main roadway and drift; (d) the intersection of the drift and main roadway.
(a)
(b)
(c)
(d)