Research Article
Study on Numerical Simulation of Surrounding Rock Structure Safety of Urban Underwater Shield Tunnel: A Case in Chongqing
Figure 18
The internal force nephogram of lining segment installed at YCK22 + 773.00 cross-section (left tunnel). (a) Bending moment after the left-line excavation is completed, (b) axial force after the left-line excavation is completed, and (c) shear force after the left-line excavation is completed.
(a) |
(b) |
(c) |