Research Article
An Improved Effective Cost Review Process for Value Engineering
Table 15
Preliminary test results for the proposed method.
| No. | Ideas generated during brainstorming alone | Ideas generated during brainstorming with specification review process | Improvement rate (%) |
| 1 | 9 | 28 | 311 | 2 | 4 | 9 | 225 | 3 | 9 | 28 | 311 | 4 | 3 | 27 | 900 | 5 | 13 | 28 | 215 | 6 | 2 | 8 | 400 | 7 | 8 | 21 | 263 | 8 | 12 | 28 | 233 | 9 | 8 | 24 | 300 | 10 | 7 | 18 | 257 |
| Avg. | 7.5 | 21.9 | 292 |
|
|