Research Article
[Retracted] An Improved Differential Evolution Solution for Software Project Scheduling Problem
Table 2
Yardstick in numerical simulations.
| Yardstick | Implication |
| Success rate | Number of trials; the proposed IDE reaches the best solution in all 100 trial runs | Optimum cost | Mean of the best feasible solutions in all 100 trial runs | Simulation time (sec) | Mean of the final time required to reach the final solution in every run | Optimum fitness | Mean fitness of best solution in all 100 runs which is defined as follows: |
|
|