Research Article
Priority-Based Dynamic Multichannel Transmission Scheme for Industrial Wireless Networks
Table 1
Application and system requirements.
| | 920-MHz band | 2.4-GHz band |
| Applications | (i) AMI (ii) Distribution automation | (i) Optimized factory (ii) Predictive maintenance |
| Application processing | (i) Remote monitoring (ii) Remote operation | (i) Remote monitoring (ii) Remote operation |
| Communication type | (i) Publish/subscribe (ii) Request/response | (i) Publish/subscribe (ii) Request/response |
| Remote monitoring cycle | 30 min (periodic data) | 1–5 min (periodic data) |
| Maximum delay for remote operation | 20–60 sec (unpredictable data) | 5–20 sec (unpredictable data) |
| Number of nodes in wireless network | 1–500 nodes | 1–500 nodes |
| Packet length | 500–600 B | 90 B |
| Communication speed | 50–100 kbps | 250 kbps |
| Protocols | (i) IEEE802.15.4g/e (ii) 6tisch (iii) 6LoWPAN | (i) ISA100.11a (ii) WirelessHART |
|
|