Research Article

A Robust Optimization Modeling for Mine Supply Chain Planning under the Big Data

Table 1

The objective function value results of the robust optimization model.

Numerical example (M-N-S-T)/Mean (T RMB)VarianceMaximum (T RMB)Minimum (T RMB)

3-2-2-3I7.76980.06458.42667.3586
II6.53420.08317.79216.3082
III5.41090.10356.12935.4098
IV5.41250.07926.04245.3905
V6.80910.05928.00096.7298

4-3-3-5I3.29830.06283.87233.0799
II2.15320.05922.89012.0003
III2.41030.04252.99042.0212
IV2.10960.06912.79032.0109
V2.02710.07012.63122.0002

6-5-6-8I111.8340.1463145.342101.093
II85.8530.1596128.09375.334
III85.2120.1394130.98476.987
IV99.0350.0809140.24287.092
V90.3520.1783134.09177.023

8-5-12-10I289.3550.0532289.731246.985
II302.4370.1903380.921251.243
III250.8760.3094359.248235.042
IV274.9020.0732320.942256.914
V289.3510.3190341.253268.933