Research Article
[Retracted] Design of Financial Information Management System and IoT Application Based on Fuzzy Comprehensive Evaluation
Table 6
Performance comparison results of two management methods.
| Name | Traditional management system | Paper system |
| Calculation quantity | Great | Very small | Time-consuming | Many | Less | Processing costs | High | Low | Processing speed | Slow | Fast | Is time value considered | No | Yes | Measurable hazard | Only the overall risk can be weighed | The overall hazard can be measured, and the single hazard can be measured | Predictable hazard | Can only predict the current danger | The danger can be estimated within a certain time range |
|
|