Simulation Calculation of the Collapse Process of High-Rise Steel Structure Energy-Forming Cutting Blasting Demolition
Table 1
Main construction equipment and equipment.
| Serial number | Equipment name | Model and specification | Quantity | Country of origin | Throughput | For construction site | Remarks |
| 1 | / | Carter 320 | 2 | U.S.A. | Good | Slag turning loading | / | 2 | Middle arm gun | Hitachi zx250 | 5 | Japan | Good | Demolition fracture | / | 3 | Extended arm special High arm shear | Shengang 480 | 1 | Japan | Good | Dismantle | / | 4 | High pressure waterwheel | Fire accident or sanitation vehicle | 1 platform | Domestic | Good | Watering down dust | / | 5 | Oxygen cutting equipment | / | 10 sets | Domestic | Good | Steel bar cutting | / | 6 | Walkie-talkie | / | 15 sets | Domestic | Good | Command liaison | / | 7 | Protective equipment | / | Some | Domestic | Excellent | Protective envoy use | / | 8 | Emergency rescue vehicle | / | 1 platform | Domestic | Excellent | First aid aid | / |
|
|