Research Article

Multiobjective Neuro-Fuzzy Controller Design and Selection of Filter Parameters of UPQC Using Predator Prey Firefly and Enhanced Harmony Search Optimization

Table 2

Test cases chosen.

CircumstanceCase 1Case 2Case 3Case 4

Balanced
Steady voltage
Unbalanced
Current
Balanced and
Balanced disturbance
Unbalanced, , , and disturbance
Irradiation of 1000 w/m2
Variable irradiance
Variation in load
Load 1: balanced 3 phase bridged rectifier load: L = 1 mH and R = 10 Ω
Load 2: balanced 3 phase bridged rectifier load: L = 2 mH and R = 20 Ω
Load 3: unbalanced 3 RL branch load:  = 10 Ω,  = 20,  = 15 Ω,  = 1.5 mH,  = 3.5 mH, and  = 2.5 mH
Load 4: balanced active reactive power load: P = 500 W and Q = 9000 Kvar